Technical Feasibility Of Erecting A Wind Turbine On A High Rise Building
Sharpe, Tim and Menon, R. (2008) Technical Feasibility Of Erecting A Wind Turbine On A High Rise Building. In: UNSPECIFIED.
|
|
Creators/Authors: | Sharpe, Tim and Menon, R. |
---|---|
Output Type: | Conference or Workshop Item (UNSPECIFIED) |
Media of Output: | Proceedings of the 10th World Renewable Energy Congress, Glasgow UK |
Schools and Departments: | Mackintosh School of Architecture Mackintosh School of Architecture > Mackintosh Environmental Architecture Research Unit (MEARU) |
Dates: | Date Date Type 25 July 2008 Published |
Status: | Published |
Output ID: | 1722 |
Deposited By: | Tim Sharpe |
Deposited On: | 21 Nov 2011 11:45 |
Last Modified: | 17 Dec 2013 14:03 |
GSA Staff Only: request a change | Repository Staff Only: item control page